India's first building-level habitability intelligence platform. We tell you which government building will fail before the cyclone hits — not after.
Category 1 landfall. Konaseema district. 50 m/s sustained winds. Not one government building had been inspected to any structural standard. We didn't know which cyclone shelters were safe. 3,000 people ran to one that scored 49 out of 127. Critical grade. This is the gap Maha-Sankalpam closes.
భారత నివాస సూచిక అంటే ఏమిటి?
Every government building gets a score out of 127 — field-verified, IS code-mapped, certified. Five layers of assessment tell you exactly what is vulnerable, what it costs to fix, and which fund pays for it.
Every checkpoint maps to an Indian Standard code. Every IS code at P0–P2 severity is automatically classified as Capital Expenditure — SDMF-eligible. The platform enforces the audit trail. No manual override.
తనిఖీ నుండి బ్యాంకబుల్ DPR వరకు 90 నిమిషాలు
Disaster Management Act 2005 § 30(2)(v) gives the District Magistrate authority to order closure of any structure posing risk to life in anticipation of a disaster event. Before IHI, a closure order based on visual assessment could be challenged in court. After IHI: IHI 49/127 · 3 P0 findings · IS 875 Part 3 violation · certified inspector signature · SHA-256 evidence chain. Not challenged. Not challengeable.
జిల్లా కలెక్టర్కు ఇది ఏమి అర్థం చేసుకుంటుంది?
AWARE 2.0 tells you the cyclone is coming. Maha-Sankalpam tells you which building will fail. The macro warning and the micro vulnerability — combined for the first time.
Every other building assessment in India stops at the report. Maha-Sankalpam closes the full loop — from IHI score to funded, tracked, verified remediation. In 90 minutes.
127-point field assessment. Every building gets a grade, a legal consequence, and a cost.
Every finding auto-mapped to Indian Standard codes. Structural + IS code = CapEx. Paint = Revenue. Schema-enforced.
CapEx findings route to SDMF. Loan-eligible projects to NABARD RIDF. ADB/WB pipeline to multilateral queue.
Detailed Project Report generated with IS citations, CPWD DSR costs, CapEx split. SDMF-formatted. ADB IVA-ready.
Collector submits SDMF application same day. Multilateral concept note package at /sdg-impact. No wait. No consultant.
Remediation milestones tracked by platform. SHA-256 evidence chain for CAG / IVA audit. IHI re-scored post-completion.
90 రోజుల పైలట్. జిల్లాకు సున్నా ఖర్చు.
50 buildings across 5 taluks. 3 SDMF-ready DPRs. Training for 10 field operators. The data belongs to the district — always. We propose this because the District Collector who drives this programme will be the first in Andhra Pradesh with a building-level vulnerability database. That is not a consulting engagement. That is a legacy.