KONASEEMA DISTRICT · ANDHRA PRADESH

మహా-సంకల్పం

The Great Resolve

India's first building-level habitability intelligence platform. We tell you which government building will fail before the cyclone hits — not after.

Watch: What is IHI? ▶Explore District Dashboard →
127
Point habitability score
5 layers, IS code-mapped
TAP TO LEARN MORE →
90 min
Inspection to certified DPR
From phone to bankable report
TAP TO LEARN MORE →
85%
Remediation SDMF-eligible
Central funding, CapEx-classified
TAP TO LEARN MORE →
₹0
Consultant cost to the district
Zero fee for DPR generation
TAP TO LEARN MORE →
☁ CYCLONE MICHAUNG · DEC 2023

Category 1 landfall. Konaseema district. 50 m/s sustained winds. Not one government building had been inspected to any structural standard. We didn't know which cyclone shelters were safe. 3,000 people ran to one that scored 49 out of 127. Critical grade. This is the gap Maha-Sankalpam closes.

Cat 1
Cyclone intensity at landfall
0 of 0
Buildings pre-certified for shelter
5
Districts in landfall path
₹0
Pre-event structural budget allocated
Source: IMD Cyclone Warning Division · NDMA Post-Disaster Needs Assessment 2023
▶ EXPLAINER 1 OF 3

What is the India Habitability Index?

భారత నివాస సూచిక అంటే ఏమిటి?

Every government building gets a score out of 127 — field-verified, IS code-mapped, certified. Five layers of assessment tell you exactly what is vulnerable, what it costs to fix, and which fund pays for it.

115–127
Preparedసన్నద్ధ
90–114
Capableసమర్థ
65–89
Developingఅభివృద్ధి
40–64
Vulnerableఅసురక్షిత
<40
Criticalక్రిటికల్
01 · WHAT IS IHI?
⬡ IHI ARCHITECTURE

127 points. 5 layers. 1 legal anchor.

Every checkpoint maps to an Indian Standard code. Every IS code at P0–P2 severity is automatically classified as Capital Expenditure — SDMF-eligible. The platform enforces the audit trail. No manual override.

🏗
25
pts
Structural Integrity
నిర్మాణ సమగ్రత
🌿
20
pts
Site & Environment
స్థల పర్యావరణం
20
pts
Services & Infrastructure
సేవలు & మౌలిక సదుపాయాలు
🏠
25
pts
Livability Intelligence
నివాస మేధస్సు
🤝
37
pts
Community Resilience
సమాజ నిరోధకత
▶ EXPLAINER 2 OF 3
02 · INSPECTION TO ACTION

From Inspection to Bankable DPR in 90 Minutes

తనిఖీ నుండి బ్యాంకబుల్ DPR వరకు 90 నిమిషాలు

📱
0 minInspector opens app offline
Full inspection on ₹12,000 Android, zero connectivity required
60 minField assessment complete
Five layers, IS codes, photos, cost estimates — all structured
🔐
75 minHub Engineer certifies report
SHA-256 signed, GPS-verified, inspector name on record
📊
86 minIHI score computed, CAP generated
Corrective Action Plan with CapEx/Revenue split and SDMF routing
🏛
90 minBankable DPR ready for SDMF
Traditional approach: 3–6 months, ₹8–15 lakh consultant fee
⚖ LEGAL ANCHOR

Disaster Management Act 2005 § 30(2)(v) gives the District Magistrate authority to order closure of any structure posing risk to life in anticipation of a disaster event. Before IHI, a closure order based on visual assessment could be challenged in court. After IHI: IHI 49/127 · 3 P0 findings · IS 875 Part 3 violation · certified inspector signature · SHA-256 evidence chain. Not challenged. Not challengeable.

DM Act 2005
§ 30(2)(v) — closure authority
SDMF
State Disaster Mitigation Fund routing
IS 875:2015
Wind load classification, Part 3
SHA-256
Cryptographic evidence chain
▶ EXPLAINER 3 OF 3

What This Means for the District Collector

జిల్లా కలెక్టర్‌కు ఇది ఏమి అర్థం చేసుకుంటుంది?

AWARE 2.0 tells you the cyclone is coming. Maha-Sankalpam tells you which building will fail. The macro warning and the micro vulnerability — combined for the first time.

KONASEEMA PILOT · JUNE 2026 · 5 BUILDINGS
49
ZP High School
Critical · 3 life-safety risks
CRITICAL
56
Primary Health Centre
Vulnerable · 1 life-safety risk
VULNERABLE
49
Cyclone Shelter
Critical · 2 life-safety risks
CRITICAL
74
Panchayat Office
Developing
DEVELOPING
81
Community Hall
Developing
DEVELOPING
66/127
District avg IHI
₹8.9L
Total remediation
₹7.4L
SDMF-eligible
4 min
DPR generation time
03 · FOR THE COLLECTOR
◎ THE FULL LOOP

We Don't Just Find the Problem.
We Fund the Fix.

Every other building assessment in India stops at the report. Maha-Sankalpam closes the full loop — from IHI score to funded, tracked, verified remediation. In 90 minutes.

📊
IHI Score
IHI స్కోర్
60 minCertified Inspector
IS Code Classification
IS కోడ్ వర్గీకరణ
InstantPlatform
🎯
Fund Route Matched
నిధుల మార్గం
InstantPlatform
📋
Bankable DPR
బ్యాంకేబుల్ DPR
4 minPlatform
🏛
Application Submitted
దరఖాస్తు సమర్పణ
Day 1Collector
Funded + Tracked
నిధి + ట్రాకింగ్
OngoingPlatform + District
📊
STEP 1
IHI Score

127-point field assessment. Every building gets a grade, a legal consequence, and a cost.

STEP 2
IS Code Classification

Every finding auto-mapped to Indian Standard codes. Structural + IS code = CapEx. Paint = Revenue. Schema-enforced.

🎯
STEP 3
Fund Route Matched

CapEx findings route to SDMF. Loan-eligible projects to NABARD RIDF. ADB/WB pipeline to multilateral queue.

📋
STEP 4
Bankable DPR

Detailed Project Report generated with IS citations, CPWD DSR costs, CapEx split. SDMF-formatted. ADB IVA-ready.

🏛
STEP 5
Application Submitted

Collector submits SDMF application same day. Multilateral concept note package at /sdg-impact. No wait. No consultant.

STEP 6
Funded + Tracked

Remediation milestones tracked by platform. SHA-256 evidence chain for CAG / IVA audit. IHI re-scored post-completion.

BEFORE MAHA-SANKALPAM
Consultant DPR: ₹8–15 lakh, 3–6 months
IS code mapping: manual, incomplete, contestable
CapEx classification: prone to misuse
SDMF utilisation: 12% nationally (CAG 2022)
Multilateral evidence: paper-based, IVA-unverifiable
DM Act closures: challenged in court
WITH MAHA-SANKALPAM
DPR generated in 4 minutes, ₹0 consultant fee
IS code mapping: platform-enforced, every finding
CapEx classification: schema-enforced, no override
SDMF utilisation: same-day application, 85% CapEx eligible
Multilateral evidence: SHA-256 cryptographic chain
DM Act closures: IHI-backed, legally unchallengeable
For ADB, World Bank, and multilateral funding partners — the full impact documentation is available as a print-ready report.
SDG & Economic Impact Report →Live District Dashboard
🏛 PILOT PROPOSAL

90-Day Pilot. Zero Cost to the District.

90 రోజుల పైలట్. జిల్లాకు సున్నా ఖర్చు.

50 buildings across 5 taluks. 3 SDMF-ready DPRs. Training for 10 field operators. The data belongs to the district — always. We propose this because the District Collector who drives this programme will be the first in Andhra Pradesh with a building-level vulnerability database. That is not a consulting engagement. That is a legacy.

Propose a Pilot →View Live District Data
IS Code-Mapped
CPWD DSR 2024 Rates
SHA-256 Evidence Chain
DM Act 2005 Compliant
ADB IVA-Ready